Box-Toppers

Tracking who most helps their teams win the most games, based on box score stats. A method to measure & compare baseball's top players.
  • Home
  • Blog
  • Leaders
    • 2022
    • 2021-2022
    • 2017-2022
    • All-time (1995-2022)
    • Season leaders '95-'24
    • Detail leaders, ’95-’24
    • Archive
  • About
    • What?
    • How?
    • Why?
    • Who?
    • Contact
  • Home
  • Blog
    • 2022
    • 2021-2022
    • 2017-2022
    • All-time (1995-2022)
    • Season leaders '95-'24
    • Detail leaders, ’95-’24
    • Archive
    • What?
    • How?
    • Why?
    • Who?
    • Contact

Blog

  • All
  • image

Texas Rangers rise to 1st, ending Tampa Bay Rays’ season-long lead atop team rankings

Shawn Plank July 21, 2023

For the first time this season, the Tampa Bay Rays have fallen from first place in Box-Toppers team rankings, passed by the new leaders, the Texas Rangers.

Team rankings

Here are Box-Toppers 2023 team rankings through games of Thursday, July 20. The column BTP shows the number of Box-Toppers points players on the team accumulated this season. The column BTP/wk shows have many points teams accumulated from July 14 to July 20 . The column Wk ago shows the team's rank at the All-Star break.

Teams BTP BTP/wk Wk ago
1 Rangers 74.6 6.5 3
2 Rays 73.7 1.0 1
3 Braves 70.4 2.0 2
4 Blue Jays 70.3 4.5 4
5 Orioles 68.3 7.7 8
6 Dodgers 67.0 4.0 6
7 Marlins 65.2 0.0 5
8 Astros 64.1 4.5 9
9 Diamondbacks 63.9 2.0 7
10 Brewers 63.8 8.0 14
11 Giants 61.6 5.7 13
12 Phillies 61.3 4.0 10
13 Twins 60.8 5.7 16
14 Red Sox 59.9 4.0 12
15 Mariners 58.7 3.7 17
16 Angels 58.1 4.0 18
17 Reds 57.2 2.0 15
18 Yankees 57.2 1.0 11
19 Guardians 56.5 3.0 19
20 Padres 53.8 2.0 20
21 Cubs 53.5 4.0 22
22 Mets 52.8 4.7 23
23 Tigers 52.1 5.7 24
24 Pirates 50.8 1.0 21
25 Cardinals 50.1 5.5 25
26 White Sox 46.7 5.0 26
27 Nationals 43.3 2.7 27
28 Rockies 41.4 3.5 28
29 Athletics 28.5 1.0 29
30 Royals 26.0 0.5 30
Chart is sortable. Click a column header to re-sort the chart by the values in that column. Refresh page to restore chart to default view.

Meanwhile, the Atlanta Braves continue to lead National League teams and the Milwaukee Brewers are the week’s hottest team.

Rangers rise to first

The Texas Rangers rise from third to first place this week with 74.6 Box-Toppers points, picking up 6.5 points in the past week since the All-Star break. They pass the Rays, who had led each of the first 14 weekly team rankings reports of 2023. The Rays fall to second overall with 73.7 Box-Toppers points, just 0.9 points behind the Rangers, picking up only 1.0 point in the past week. The Rangers lead over the top NL team, the Braves, by 4.2 points.

The Rangers have baseball’s fourth-best winning percentage (.598), behind the Braves (.653), the Baltimore Orioles (.615) and the Rays (.600). The Braves are third in Box-Toppers team rankings (70.4 points), the Orioles are fifth (68.3 points) and the Rays are second (73.7 points).

The Rangers are led by pitcher Nathan Eovaldi (9.7 Box-Toppers points, 12th among all players and sixth among AL pitchers). Rangers’ top batter is Marcus Semien (5.7 points, eighth among AL batters). There are 22 different Rangers players who have earned Box-Toppers points so far in 2023.

Braves lead National League teams

The Braves lead NL teams for the third week, falling from second to third place overall with 70.4 points, picking up 2.0 in the past week. The Braves rank ahead of the second-place NL team, the Los Angeles Dodgers (67.0 points, sixth overall).

The Braves have baseball’s best winning percentage (.653) and are led by pitcher Spencer Strider (12.7 points), second overall and first among NL pitchers. Top batter is Ronald Acuna Jr. (6.0 points), third among NL batters. There are 21 different Braves players who have earned Box-Toppers points so far in 2023.

Hottest team: Brewers

The Milwaukee Brewers are the week’s hottest team, picking up 8.0 Box-Toppers points in the past week since the All-Star break, most of any team. They also have the biggest jump of any team, rising four spots from 14th to 10th place overall with 63.8 points.

Biggest decline: Yankees

The New York Yankees had the biggest decline among all teams in the past week, falling seven spots since the All-Star break from 11th to 18th place with 57.2 points, picking up 1.0 point in the past week.

Last place: Royals

The Kansas City Royals remain in 30th and last place in Box-Toppers team rankings for the second week with 26.0 Box-Toppers points, picking up a net 0.5 points in the past week (they earned 2.5 points during the week, but traded Mike Mayers to the White Sox, who earned 2.0 points in 2023).

About Box-Toppers

Box-Toppers tracks who most helps their team win the most games. Using standard box score statistics, Box-Toppers uses a simple formula to determine a Player of the Game for each Major League Baseball game played. That player is the person who contributed most to his team’s win. In regular season games, players earn 1.0 Box-Toppers point for being named Player of the Game and can earn bonus points for being Player of the Day or top player or batter in their league for the day.

Box-Toppers strives for accuracy. See a mistake in a post? A wrong name, wrong team, grammar error, spelling goof, etc.? Thanks for pointing it out! Contact Box-Toppers here. Let's fix it and make it right.

For additional updates, follow Box-Toppers on Twitter.

Related

Last week’s Box-Toppers team rankings report

TagsBox-Toppers Team Power Rankings, Tampa Bay Rays, Texas Rangers, Atlanta Braves, Milwaukee Brewers, Baltimore Orioles, Nathan Eovaldi, Marcus Semien, Los Angeles Dodgers, Spencer Strider, Ronald Acuña Jr., New York Yankees, Kansas City Royals, Mike Mayers
  • Blog
  • Older
  • Newer

Quick links

▪️ Newsletter
Sign up for Box-Toppers’ email newsletter for post updates.
▪️ Contribute
Support Box-Toppers by contributing in $5 increments at Buy me a coffee.
▪️ Search
Search Box-Toppers website.

Past posts

Hover over dates to see that day's posts.
Advanced search

Recent posts

Featured
Jul 25, 2025
Phillies pass Tigers to lead Box-Toppers team rankings, Mariners rise on Naylor trade
Jul 25, 2025
Jul 25, 2025
Jul 25, 2025
Blue Jays’ Lauer tops players for Thursday, July 24; Cardinals’ Contreras tops NL players
Jul 25, 2025
Jul 25, 2025
Jul 24, 2025
Reds’ Lodolo tops players for Wednesday, July 23; Royals’ Pasquantino tops AL players
Jul 24, 2025
Jul 24, 2025
Jul 23, 2025
Phillies’ Sanchez tops players for Tuesday, July 22; Mariners’ Gilbert tops AL players
Jul 23, 2025
Jul 23, 2025
Jul 22, 2025
Brewers’ Woodruff tops players for Monday, July 21, Wheeler, Skenes rise in top 10 list
Jul 22, 2025
Jul 22, 2025

Follow Box-Toppers

▪️ Subscribe RSS
▪️ Bluesky
▪️ Twitter/X
▪️ Facebook
▪️ Apple News
▪️ Substack

Box-Toppers tag cloud

Top 20 topics mentioned in Box-Toppers blog. For top 100 topics, click here.

  • Box-Toppers Daily Scorecard
  • Box-Toppers debut
  • Clayton Kershaw
  • Max Scherzer
  • Justin Verlander
  • Los Angeles Dodgers
  • Gerrit Cole
  • Chris Sale
  • Box-Toppers Player Rankings
  • Shohei Ohtani
  • Zack Greinke
  • Houston Astros
  • Postseason
  • Streak with at least 1.0 Box-Toppers point in a season
  • Aaron Judge
  • Jacob deGrom
  • New York Yankees
  • Box-Toppers Team Power Rankings
  • MLB
  • Corey Kluber
twitter facebook

© 2013-2025 Shawn Plank

Box-Toppers

Tracking who most helps their teams win the most games, based on box score stats. A method to measure & compare baseball's top players.

Box-Toppers tracks who most helps their team win the most games. Using standard box score statistics, Box-Toppers uses a simple formula to determine a Player of the Game for each Major League Baseball game played. That player is the person who contributed most to his team’s win. Players earn Box-Toppers points for being named Player of the Game and can earn bonus points for being Player of the Day or top player or batter in their league for the day.

twitter facebook